Archive

What is required to connect to services?

08/12/2016, by Mopod Australia, 0 comments


The client needs to engage a licensed electrician to connect the prewired modules to the existing property subboard. The client…

What after sales service is provided?

08/12/2016, by Mopod Australia, 0 comments


Mopod Australia offers ongoing support for any modifications and maintenance requirements.

What is the process to own a Mopod structure?

08/12/2016, by Mopod Australia, 0 comments


The purchase process is quick and easy. To own & walk into a Mopod: 1. DESIGN, QUOTE & ORDER ¬†Select…

What cooling and heating options are available?

08/12/2016, by Mopod Australia, 0 comments


Location and climate will dictate heating and cooling requirements. Our 5 star energy efficiency rating minimizes these needs. Mopods can…

Are water tanks and solar systems available?

08/12/2016, by Mopod Australia, 0 comments


Yes. The Mopod structure has been designed to accommodate autonomous power services

Is there a choice of finishes available?

08/12/2016, by Mopod Australia, 0 comments


Yes. Mopod Australia has a range of finishes to select from.

Can Mopods be added to or reconfigured?

08/12/2016, by Mopod Australia, 0 comments


Yes. The unique modular building system allows for extensions and reconfigurations.

Is the structure collapsible and moveable?

08/12/2016, by Mopod Australia, 0 comments


Yes, Mopods can be readily relocated. The collapsible design allows for easy, cost efficient flat-pack transportation Australia wide. Less than…

How long does it take to install a Mopod?

08/12/2016, by Mopod Australia, 0 comments


One day for pad footings, usually a week prior to installation. A single module (The Mopod): one day for installation…

How are Mopods installed?

08/12/2016, by Mopod Australia, 0 comments


Pad footings are installed on site one week prior to delivery of the Mopod. The collapsed Mopod structure is flat-packed…

1 2