How are Mopods installed?

08/12/2016, by Mopod Australia, in , 0 comments

Pad footings are installed on site one week prior to delivery of the Mopod.
The collapsed Mopod structure is flat-packed ex factory onto a truck and transported to site. The Mopod is assembled by our qualified team and fitted out to completion. If the site does not permit crane truck access, the modules can be broken into walk through component form and manually installed by our team.