One day for pad footings, usually a week prior to installation.
A single module (The Mopod):
one day for installation
Studio Pods:
less than two days for installation
Duo Pods:
two days installation.
08/12/2016, by Mopod Australia, in , 0 comments
One day for pad footings, usually a week prior to installation.
A single module (The Mopod):
one day for installation
Studio Pods:
less than two days for installation
Duo Pods:
two days installation.